Powerline Right-of-Way Tree Clearing

This field is for validation purposes and should be left unchanged.
Date (mm/dd/yyyy)(Required)
911 Address of Tree Cutting:(Required)
Max. file size: 100 MB.
• MLEC will not cut any trees hanging over structures, or any that are not endangering the power lines. • MLEC will not schedule this work. Tree cutting and/or trimming will be completed as time permits. • Upon receiving the completed form, the ROW supervisor reviews and deems if the tree(s) are threatening to cooperative equipment. If denied, the member must seek other options such as a tree removal contractor. We will not schedule this work. Tree cutting and/or trimming will be completed as time permits.