With the implementation of our AMI (Advanced Metering Infrastructure) metering system, MLEC has revised our procedure for allowing electricians or members to work on any part of live transformer secondaries or meter socket enclosures. MLEC recognizes the safety hazards created by unsealing and removing meters from their meter sockets. Our AMI metering infrastructure allows us to be notified almost instantly when an outage occurs, or a meter is removed.
Electricians or members are required to contact MLEC to schedule the removal of a meter, or the need for the disconnection of service to work within a live meter socket enclosure or for work on transformer secondary wiring. Failure to do so will result in monetary reimbursement equal to the cost of labor and equipment dispatched to the site. Wiring on the secondary side of transformer taps is owned by, and the responsibility of the members.
You can schedule an outage by calling (800) 450-2191, both during and after business hours. If calling during business hours, please ask for Operations.