Skip to main content

Search form

Pay My Bill
Report an Outage
Check E-Mail
Contact Us
Load Control
Home

SmartHub Login

Loading SmartHub...

'Loading NISC SmartHub log in. Please wait...'
Menu

Latest

  • Submit your photos for the 2024 MLEC photo calendar!
  • CONTRACTOR NOTICE - New procedures are in place when removing or disconnecting meters. Click to learn more.          
1 of 2 
  • Home
  • My Co-op
    • News Center
    • Board Meetings
    • Annual Meeting and Reports
    • Director Elections
    • Capital Credits
    • Bylaws
  • My Community
    • Concern for Community
    • Operation Round Up
    • Youth Tour
    • Safety Resources
    • Economic Development
  • Products & Services
    • New Member Information
    • Billing
    • New Electric Service
    • Transfer Electric Service
    • Energy Wise MN Store
    • Standby Generators
    • Right-of-Way Clearing
  • Energy
    • Heating & Cooling
    • Rebates
    • Energy Rates
    • Solar & Wind Generation
    • Electric Vehicles
    • Energy Star Appliances
    • Energy Assessments
    • Energy Source Mix
    • Energy Tips
    • Energy Links
  • Internet
  • Outage Center
  • Quick Links
    • Contractors
    • Forms
    • Load Control Schedule
    • Newsletters
    • Rebates
    • Photo Calendar Contest
  • Access Charge Increase
  • Headquarters Project
  • About Us
    • Co-op Principles
    • Our History
    • Our Mission
    • Board of Directors
    • Service Territory Map
    • Touchstone Energy
    • Non-Discrimination Statement
    • Career Opportunities
    • Contact Us

New Electric Service

Welcome to MLEC!

We are happy to have you as a member!
Read below to initiate your new service request.

 

New Electric Service

You may come to our Aitkin office or contact us by phone or email with the new service information. If you contact us by phone, you will be sent the paperwork. If you come to our office, we can take care of the paperwork at that time.

To start a new electric service, when there has not been previous service at the property:

Please return the following to initiate your new service request:

  1. Signed application for service. New Service Application Please print the page and sign prior to returning to MLEC.
  2. Initial cost contribution of $250.00

An easement will be sent to you for completion prior to building your new service - you will need the legal description and a copy of the property deed.

A $265.00 deposit will be needed before we can install service. Deposits are applied to your account after 12 months of on time payment history with us. 

  • Following receipt of the application with your social security number, MLEC will run a brief credit check. If a satisfactory credit history is found, the deposit will be waived/refunded.

All fees are due before construction begins. The following may be included:

  • Footage charges of $7.50 per foot for single phase residential power.
  • Transformer fee of $500 if a new transformer needs to be set for your service.
  • Administration fee of $75.
  • All fees for any special permits such as those required for road crossings and the DNR are your responsibility. Permits are not applied for until all paperwork and payments are received in our office. MLEC will help you apply for any permits you may need. The length of time to receive permits is dependent on the agencies involved.
  • A distance less than 300 feet will be constructed overhead unless it's an extension of an existing underground installation. If underground service is requested for under 300 feet that is not an extension of an existing underground installation, the request may be granted if you pay $2,250 for a minimum distance of 300 feet.
  • It is your responsibility to provide a meter loop with an appropriate disconnect. Services of 200 amps or more require a meter base equipped with built-in bypass capability. By State Electrical Code, all wiring must be inspected by the state electrical inspector. All commercial wiring must be installed by a licensed electrician. Residential wiring may be installed by either the homeowner or a licensed electrician. A list of electricians is enclosed OR, for your convenience, the cooperative will coordinate the meter loop installation for you. If you choose this option, your installed cost is $900.00 for a 200 amp loop payable prior to installation. The loop will include a meter base/disconnect combination unit with eight additional breaker spaces, one 20 amp circuit breaker and a weather proof GFI receptacle. Meter loops are maintained and owned by the property owner as are any wires beyond the meter loop. The meter is maintained by and remains the property of the Cooperative.    

MLEC has the right to cancel your pending new service if not installed within a year from receiving your application.

Call Operations at 218-429-0435 or 888-724-9798; or, email mlec@mlecmn.net with any questions.

Owner's Manual

You are a member/owner when you receive electric service from MLEC - Find out more about your cooperative in the Owner's Manual

Click Here

Looking for a contractor?

Click below for a list of local contractors.

Click Here
Back to Top

If you do not find what you need or are unable to access any information on this website, please contact us.

Quick Links

  • Contact Us
  • News Center
  • Careers
  • Outage Center
  • Privacy Policy

Follow Us!

©2023 Mille Lacs Energy Cooperative. All Rights Reserved

  • Home
  • My Co-op
    • News Center
    • Board Meetings
    • Annual Meeting and Reports
    • Director Elections
    • Capital Credits
    • Bylaws
  • My Community
    • Concern for Community
    • Operation Round Up
    • Youth Tour
    • Safety Resources
    • Economic Development
  • Products & Services
    • New Member Information
    • Billing
    • New Electric Service
    • Transfer Electric Service
    • Energy Wise MN Store
    • Standby Generators
    • Right-of-Way Clearing
  • Energy
    • Heating & Cooling
    • Rebates
    • Energy Rates
    • Solar & Wind Generation
    • Electric Vehicles
    • Energy Star Appliances
    • Energy Assessments
    • Energy Source Mix
    • Energy Tips
    • Energy Links
  • Internet
  • Outage Center
  • Quick Links
    • Contractors
    • Forms
    • Load Control Schedule
    • Newsletters
    • Rebates
    • Photo Calendar Contest
  • Access Charge Increase
  • Headquarters Project
  • About Us
    • Co-op Principles
    • Our History
    • Our Mission
    • Board of Directors
    • Service Territory Map
    • Touchstone Energy
    • Non-Discrimination Statement
    • Career Opportunities
    • Contact Us